• ARA Basel

Expansion of one of the largest sewage plants in Switzerland

A WWTP of this size requires more than 700 different valves, many of which have large nominal sizes or need to be made to measure. Since the production capacity of the Sistag factory is limited, each individual step had to be planned and scheduled meticulously. Some of the work on site had to be performed while the water treatment plant was operational.
Please use a modern web browser